Drayton Sewage Treatment Works

Product: EasyPIT® ULTRA & Ductile Iron Covers

Contractor: Tilbury Douglas Construction Ltd

Location: Abbingdon, OX14 4EZ

Overview:

We recently supplied our EasyPIT Ultra chamber system alongside ductile iron access covers and frames to the infrastructure works at Drayton STW being undertaken by Tilbury Douglas on behalf of Thames Water.

This project saw the supply of a range of chamber sizes from 1200x1200mm to 750x750mm clear openings with associated D400 loading ductile covers to suit.